A data center cannot simply be “plugged into the grid.” A large-scale data center may require electrical capacity comparable to that of a major industrial facility, while its power supply must remain available 24/7.

⚡ For the power system, this means that utilities and grid operators must assess in advance whether substations, transmission and distribution lines, and available generation capacity can accommodate the additional demand. In some cases, providing a new connection is not sufficient, and substantial expansion or reinforcement of the grid infrastructure is required.

📊 The scale of this challenge is increasing alongside the rapid development of artificial intelligence. According to the International Energy Agency, electricity consumption by data centers increased by approximately 17% in 2025, while their global electricity demand could double by 2030. At the same time, limitations in grid capacity can already delay the connection of new data centers.

🔌 Another important characteristic is that modern AI-oriented data centers can create large and rapidly changing electrical loads. As a result, power engineers must address not only the question of where the required capacity will come from, but also how to maintain the reliability, stability, and resilience of the power system under these changing operating conditions.

🤖 This creates an interesting paradox: the faster artificial intelligence develops, the more important physical energy infrastructure becomes — transformers, transmission lines, generation facilities, energy storage systems, and effective power-system operation and control.